LUNA Pipes   Your source for the best smoke around!
Repairs · Restoration · Custom Briars · Racks · Tampers · Tools


Home
About
F.A.Q.
Contact
Fantasy Pipes
New Pipes For Sale

Estate Pipes for Sale
Tools
Tampers
Racks

Wooden Tops
The Process
Photo Gallery
Links
Payments

New Shop
Kidney Transplant

 


©2002 LUNA Pipes
site by: GETSCH.net

New Shop:

New pictures as of 10/19/03

Previous Page 1 2 3 Next Page

lumberpile.jpg (71745 bytes)
The lumber has arrived. We're ready to build.
firstwall.jpg (106847 bytes)
The first wall rises!
wall2.jpg (94137 bytes)
Here comes the second wall.
laser.jpg (99796 bytes)
Using the fancy laser to level the walls.
nailgun.jpg (88176 bytes)
Daddy, this nail gun is really loud!
floorjoists.jpg (89449 bytes)
Floor joists for the storage loft.
slabpump.jpg (73547 bytes)
Pumping the slab.
floatslab.jpg (87507 bytes)
Floating the slab.
sheath.jpg (88854 bytes)
Sheathing the first floor.
sheath2.jpg (87241 bytes)
Loft floor decking is on. The octagonal opening will be a window over the stairs.
emmalaser.jpg (80378 bytes)
Emma directs the leveling of the loft.

 
truss.jpg (80134 bytes)
The loft is sheathed and the roof begins.

 

Previous Page 1 2 3 Next Page